Content
→
Mono-layer roofs
→
With thermal insulation with reverse order of layers
→
Trafficable
→
Grassing
→
Extensive
→
Plastic foil waterproofing
→
anchored drainage layer (HL350.1)
→
For roof area from 25m
2
Javascript not supported.
drawing
Magnify
DXF
PDF
Detail
drawing 132312ay
layer section
· vegetation layer under 200mm
· filter layer
· water accumulating layer
· drainage layer
· XPS thermal insulation
· separating membrane with draining function
· plastic foil waterproofing
· separating membrane
· concrete (gravity layer or ceiling structure)
recommended products
HL616K
HL86.0
HL190
HL620
HL0606.3E
Comment
Heated roof drains
Attachments
Installation advice
Help
Content
→
Mono-layer roofs
→
With thermal insulation with reverse order of layers
→
Trafficable
→
Grassing
→
Extensive
→
Plastic foil waterproofing
→
anchored drainage layer (HL350.1)
→
For roof area from 25m
2
©1992-2011
HL HUTTERER LECHNER GmbH
- All rights reserved.
Errors and changes excepted. Without engagement.